Short answer

An addition usually needs a building permit before construction starts. We prepare the permit drawings for your addition and help you through the municipal permit process, from the first assessment to responding to review comments.

A red-brick two-storey house seen from its garden, with a new two-storey rear addition in dark standing-seam metal over cedar boards and wide glass doors onto a stone patio.
Rendered study for illustration, not a client project.

Quick permit overview

Usually in the application
A site plan showing the addition, property lines and setbacks; Floor plans, elevations and building sections; Structural information, which may need a structural engineer; Energy efficiency and other Building Code compliance information; A current survey of the property, where the municipality asks for one.
Permits issued by
The municipality where the property is. Its building department reviews the application, decides whether a permit is issued and inspects the work.Source: Ontario: regulatory roles for construction and renovations(opens in a new tab)
Who can design the drawings
A designer registered with a BCIN (Building Code Identification Number), an architect or a professional engineer. Larger buildings, over three storeys or over 600 m² in gross area, generally need an architect.Source: Ontario: become a registered building practitioner (BCIN, QuARTS)(opens in a new tab)
Municipal review time
Ontario's Building Code sets time frames for a decision on a complete application. The City of Toronto, for example, lists 10 business days for houses, 15 for small buildings, 20 for large buildings and 30 for complex buildings. Incomplete applications or revisions can extend this.Source: City of Toronto: Building permit review streams(opens in a new tab)
What PermitGuys does
Designs the project and prepares the architectural and engineering drawings (Small Buildings BCIN, licensed P.Eng. engineers, architectural stamps in house), then submits the permit application as the owner's agent. The municipality decides whether a permit is issued.
Where we work
Toronto, Mississauga, Oakville, Brampton, Markham, Newmarket, Aurora, Oshawa, Burlington, Hamilton.

What does this service include?

An addition changes the footprint, height or structure of your house, so it is reviewed against both zoning rules and the Ontario Building Code. Getting the drawings right at the start helps reduce revision rounds.

We start by understanding what you want the space to do, then check the main zoning and building considerations we can identify for your lot before drawing. If something needs another consultant or a planning approval, we tell you early.

Who is this service for?

  • Homeowners planning a rear, side or second-storey addition.
  • Families adding space for a growing household or relatives.
  • Owners who want drawings and permit support from the same team.

What does a permit application usually need?

Addition applications commonly include items such as:
  • A site plan showing the addition, property lines and setbacks.
  • Floor plans, elevations and building sections.
  • Structural information, which may need a structural engineer.
  • Energy efficiency and other Building Code compliance information.
  • A current survey of the property, where the municipality asks for one.

Requirements depend on your municipality, your property and the specific scope of work. Your local building department makes the final determination, so we confirm requirements for each project rather than assume them.

Who does what, step by step?

Each step shows who carries it. We prepare drawings and documentation; the municipality reviews the application and decides on the permit.
  1. 01

    Tell us about the project

    You share what you want to build, the property address and any existing drawings, surveys or photos of the house and lot.

    Handled by: You

  2. 02

    Assess the requirements

    We review the scope against the applicable zoning and Building Code considerations we can identify, and flag anything that may need input from other consultants or the municipality.

    Handled by: PermitGuys

  3. 03

    Design, engineering and drawings

    We design the project, work out the engineering it needs, prepare the permit drawings and assemble the documentation, coordinating with any other specialists the project requires.

    Handled by: PermitGuys

  4. 04

    Municipal review

    The municipality reviews the application, may ask questions or request revisions, and decides whether to issue the permit.

    Handled by: Municipality

  5. 05

    Respond to review comments

    Where the municipality comments on the drawings, we help you understand the comments and revise the drawings we prepared.

    Handled by: PermitGuys

What affects cost and timing?

We do not publish set prices or timelines because both depend on the project. These are the factors that shape them.

Cost factors

  • The size and complexity of the project and how many drawings it needs.
  • Whether existing-condition measurements, a survey or as-built drawings are needed first.
  • Whether the project needs input from structural, mechanical or other consultants.
  • Whether a zoning variance or other planning approval is needed before a permit.
  • The number of revision rounds the municipal review requires.

Timeline factors

  • How quickly site information, surveys and decisions are available.
  • Whether a planning approval, such as a minor variance, is needed first.
  • Whether the application is complete when submitted.
  • The municipality's current review workload and any requests for revisions.

Examples of our work

Written-up projects appear here as clients approve them. Renderings from our client projects are on the projects page.

PLACEHOLDER: approved residential additions case studies. This block lists real projects automatically once they are added to src/content/projects.ts with approved: true.

Common questions

Do I need a permit for a home addition?

In Ontario, building a new structure or adding to an existing one generally requires a building permit from your municipality. Your local building department confirms what your specific project needs.

What if my addition does not meet zoning rules?

If a design does not meet the zoning by-law, it may need a planning approval such as a minor variance before a building permit can be issued. We flag this when we assess your project so you can decide how to proceed.

How much will this cost?

Fees depend on the scope of your project, so we quote after we understand what you want to build. Municipal permit fees are separate and are set by your municipality.

Start a conversation

Discuss your residential additions project.

Share what you are planning and where. We will review the details and explain how we can help with drawings and the permit process.

What happens next

  1. 01You tell us what you are planning and where.
  2. 02We review the details and reply to explain how we can help.
  3. 03You decide whether to go ahead.