Commercial service
Commercial Permits
Short answer
Most commercial construction, alteration and change-of-use projects need a building permit. We prepare the permit drawings and documentation for commercial projects and help owners and tenants work through the municipal review.

Quick permit overview
- Usually in the application
- Floor plans showing the existing and proposed layout; Information on the building's occupancy and any change of use; Fire separations, exits and life safety information; Accessibility information where the work triggers it; Mechanical, electrical or structural drawings from other consultants, where needed.
- Permits issued by
- The municipality where the property is. Its building department reviews the application, decides whether a permit is issued and inspects the work.Source: Ontario: regulatory roles for construction and renovations(opens in a new tab)
- Who can design the drawings
- A designer registered with a BCIN (Building Code Identification Number), an architect or a professional engineer. Larger buildings, over three storeys or over 600 m² in gross area, generally need an architect.Source: Ontario: become a registered building practitioner (BCIN, QuARTS)(opens in a new tab)
- Municipal review time
- Ontario's Building Code sets time frames for a decision on a complete application. The City of Toronto, for example, lists 10 business days for houses, 15 for small buildings, 20 for large buildings and 30 for complex buildings. Incomplete applications or revisions can extend this.Source: City of Toronto: Building permit review streams(opens in a new tab)
- What PermitGuys does
- Designs the project and prepares the architectural and engineering drawings (Small Buildings BCIN, licensed P.Eng. engineers, architectural stamps in house), then submits the permit application as the owner's agent. The municipality decides whether a permit is issued.
- Where we work
- Toronto, Mississauga, Oakville, Brampton, Markham, Newmarket, Aurora, Oshawa, Burlington, Hamilton.
What does this service include?
Commercial projects are reviewed against requirements for occupancy, fire safety, accessibility and exits, and often involve several consultants. A clear permit package helps the review focus on the project rather than missing information.
We work with owners, tenants and property managers to define the scope, identify the requirements we can see at the outset, and coordinate the drawings with any engineers the project needs.
Who is this service for?
- Business owners fitting out or altering a commercial space.
- Property owners preparing a unit for a new tenant.
- Tenants whose lease requires a permitted fit-out.
What does a permit application usually need?
- Floor plans showing the existing and proposed layout.
- Information on the building's occupancy and any change of use.
- Fire separations, exits and life safety information.
- Accessibility information where the work triggers it.
- Mechanical, electrical or structural drawings from other consultants, where needed.
Requirements depend on your municipality, your property and the specific scope of work. Your local building department makes the final determination, so we confirm requirements for each project rather than assume them.
Who does what, step by step?
- 01
Tell us about the project
You share what you want to build, the property address and any existing drawings, surveys or photos of the existing space.
Handled by: You
- 02
Assess the requirements
We review the scope against the applicable zoning and Building Code considerations we can identify, and flag anything that may need input from other consultants or the municipality.
Handled by: PermitGuys
- 03
Design, engineering and drawings
We design the project, work out the engineering it needs, prepare the permit drawings and assemble the documentation, coordinating with any other specialists the project requires.
Handled by: PermitGuys
- 04
Municipal review
The municipality reviews the application, may ask questions or request revisions, and decides whether to issue the permit.
Handled by: Municipality
- 05
Respond to review comments
Where the municipality comments on the drawings, we help you understand the comments and revise the drawings we prepared.
Handled by: PermitGuys
What affects cost and timing?
Cost factors
- The size and complexity of the project and how many drawings it needs.
- Whether existing-condition measurements, a survey or as-built drawings are needed first.
- Whether the project needs input from structural, mechanical or other consultants.
- Whether a zoning variance or other planning approval is needed before a permit.
- The number of revision rounds the municipal review requires.
- Whether the work involves a change in how the space is used.
Timeline factors
- How quickly site information, surveys and decisions are available.
- Whether a planning approval, such as a minor variance, is needed first.
- Whether the application is complete when submitted.
- The municipality's current review workload and any requests for revisions.
Examples of our work
Written-up projects appear here as clients approve them. Renderings from our client projects are on the projects page.
Common questions
Does a change of use need a permit?
Changing how part or all of a building is used may require a permit in Ontario even when little construction is planned. Your municipality confirms whether your proposed use needs one.
Can you coordinate with my landlord or property manager?
Yes. We can work with the people who need to review or approve the drawings, so the permit package reflects the building's requirements as well as yours.
How much will this cost?
Fees depend on the scope of your project, so we quote after we understand what you want to build. Municipal permit fees are separate and are set by your municipality.
Start a conversation
Discuss your commercial project.
Share what you are planning and where. We will review the details and explain how we can help with drawings and the permit process.
What happens next
- 01You tell us what you are planning and where.
- 02We review the details and reply to explain how we can help.
- 03You decide whether to go ahead.