Skip to main content

Permit guide

How do I make a basement apartment legal?

What is usually involved in creating a legal basement apartment or second unit in the GTA.

Short answer

To create a legal basement apartment in Ontario you need a building permit, and the unit must meet the Building Code, the Fire Code and your municipality's zoning rules. Some GTA municipalities also require second units to be registered.

PLACEHOLDER: review date, set once a qualified reviewer has checked this guide

Which approvals does a basement apartment involve?

The Government of Ontario's guide to adding a second unit recommends speaking with your municipality's planning and building departments first, because they can confirm the zoning, Building Code and permit requirements for your property.

  • A building permit for the work to create the unit.
  • Zoning permission for the additional unit, including any parking requirements.
  • Electrical inspection, which in Ontario is handled by the Electrical Safety Authority.
  • Registration or licensing of the unit, where your municipality requires it.

What do reviewers commonly look at?

Common points of review for basement units include ceiling height, exits and egress windows, fire separations between units, smoke and carbon monoxide alarms, and heating and ventilation. Requirements can differ depending on the age of the house.

Why check feasibility before you design?

Some basements need significant work to become a legal unit, for example to achieve the required ceiling height or a compliant exit. A feasibility review of the existing basement before full drawings helps you understand what the project involves.

Key terms

Second unit
A self-contained residential unit, such as a basement apartment, created within a house or on the same property. Ontario also uses the term additional residential unit.
Fire separation
Construction, such as walls and ceilings with a required fire-resistance rating, that limits the spread of fire between units.

Questions

My basement apartment already exists. Can it be permitted?

Often an existing unit can be brought into compliance through a permit application, though it may need alterations. Your municipality can explain the route for existing units.

Sources and review

This guide is general information, not legal or code advice. Requirements change, and your municipality decides what applies to your property.
  1. Add a second unit to your house(opens in a new tab)

    Government of Ontario · Link not yet verified by PermitGuys

  2. Electrical Safety Authority(opens in a new tab)

    Electrical Safety Authority (Ontario) · Link not yet verified by PermitGuys

  3. Building Code Act, 1992, S.O. 1992, c. 23(opens in a new tab)

    Government of Ontario (e-Laws) · Link not yet verified by PermitGuys

Reviewed by

PLACEHOLDER: name and verified credentials of the person who reviews this guide

Start a conversation

Have a question about your own project?

Share what you are planning and where. We will review the details and explain how we can help with drawings and the permit process.

What happens next

  1. 01You tell us what you are planning and where.
  2. 02We review the details and reply to explain how we can help.
  3. 03You decide whether to go ahead.