Interior Renovation Permits
Short answer
Interior renovations that change structure, layout, plumbing or how a space is used often need a building permit, while some cosmetic work may not. We help you find out which applies and prepare the drawings when a permit is needed.

Quick permit overview
- Usually in the application
- Existing and proposed floor plans; Structural details for any beams, posts or wall removals; Plumbing information where fixtures are added or moved; Fire separation and exit information for commercial or multi-unit spaces.
- Permits issued by
- The municipality where the property is. Its building department reviews the application, decides whether a permit is issued and inspects the work.Source: Ontario: regulatory roles for construction and renovations(opens in a new tab)
- Who can design the drawings
- A designer registered with a BCIN (Building Code Identification Number), an architect or a professional engineer. Larger buildings, over three storeys or over 600 m² in gross area, generally need an architect.Source: Ontario: become a registered building practitioner (BCIN, QuARTS)(opens in a new tab)
- Municipal review time
- Ontario's Building Code sets time frames for a decision on a complete application. The City of Toronto, for example, lists 10 business days for houses, 15 for small buildings, 20 for large buildings and 30 for complex buildings. Incomplete applications or revisions can extend this.Source: City of Toronto: Building permit review streams(opens in a new tab)
- What PermitGuys does
- Designs the project and prepares the architectural and engineering drawings (Small Buildings BCIN, licensed P.Eng. engineers, architectural stamps in house), then submits the permit application as the owner's agent. The municipality decides whether a permit is issued.
- Where we work
- Toronto, Mississauga, Oakville, Brampton, Markham, Newmarket, Aurora, Oshawa, Burlington, Hamilton.
What does this service include?
Removing or moving a load-bearing wall, adding a bathroom, finishing a basement or reconfiguring a commercial interior can all trigger a permit. Cosmetic updates such as painting or replacing finishes typically do not, but your municipality is the authority.
We document the existing conditions, design the proposed layout for permit, and coordinate structural input where walls or beams are affected.
Who is this service for?
- Homeowners opening up a floor plan or removing a wall.
- Owners adding a bathroom or finishing a basement.
- Businesses reconfiguring an office, clinic or retail interior.
What does a permit application usually need?
- Existing and proposed floor plans.
- Structural details for any beams, posts or wall removals.
- Plumbing information where fixtures are added or moved.
- Fire separation and exit information for commercial or multi-unit spaces.
Requirements depend on your municipality, your property and the specific scope of work. Your local building department makes the final determination, so we confirm requirements for each project rather than assume them.
Who does what, step by step?
- 01
Tell us about the project
You share what you want to build, the property address and any existing drawings, surveys or photos of the existing interior.
Handled by: You
- 02
Assess the requirements
We review the scope against the applicable zoning and Building Code considerations we can identify, and flag anything that may need input from other consultants or the municipality.
Handled by: PermitGuys
- 03
Design, engineering and drawings
We design the project, work out the engineering it needs, prepare the permit drawings and assemble the documentation, coordinating with any other specialists the project requires.
Handled by: PermitGuys
- 04
Municipal review
The municipality reviews the application, may ask questions or request revisions, and decides whether to issue the permit.
Handled by: Municipality
- 05
Respond to review comments
Where the municipality comments on the drawings, we help you understand the comments and revise the drawings we prepared.
Handled by: PermitGuys
What affects cost and timing?
Cost factors
- The size and complexity of the project and how many drawings it needs.
- Whether existing-condition measurements, a survey or as-built drawings are needed first.
- Whether the project needs input from structural, mechanical or other consultants.
- Whether a zoning variance or other planning approval is needed before a permit.
- The number of revision rounds the municipal review requires.
Timeline factors
- How quickly site information, surveys and decisions are available.
- Whether a planning approval, such as a minor variance, is needed first.
- Whether the application is complete when submitted.
- The municipality's current review workload and any requests for revisions.
Examples of our work
Written-up projects appear here as clients approve them. Renderings from our client projects are on the projects page.
Common questions
Do I need a permit to remove a wall?
Moving or removing a load-bearing wall commonly requires a building permit in GTA municipalities. Whether a non-load-bearing wall needs one depends on your municipality and the work involved, so confirm with your building department.
How much will this cost?
Fees depend on the scope of your project, so we quote after we understand what you want to build. Municipal permit fees are separate and are set by your municipality.
Start a conversation
Discuss your interior renovations project.
Share what you are planning and where. We will review the details and explain how we can help with drawings and the permit process.
What happens next
- 01You tell us what you are planning and where.
- 02We review the details and reply to explain how we can help.
- 03You decide whether to go ahead.