How do permits work for a home addition?

What a home addition permit application usually involves in the GTA, from zoning checks to drawings and municipal review.

Short answer

A home addition generally needs a building permit, and the design must meet both your municipality's zoning by-law and the Ontario Building Code. If the design does not meet zoning, a planning approval such as a minor variance may be needed before the permit can be issued.

PLACEHOLDER: review date, set once a qualified reviewer has checked this guide

Why does an addition start with zoning?

Zoning by-laws control things like how close an addition can be to the property lines, how tall it can be and how much of the lot can be covered. Checking these early tells you how much room the design has.

Where a design does not meet a zoning requirement, owners can usually apply to the municipality's Committee of Adjustment for a minor variance. That is a separate process, and it generally has to be resolved before the building permit is issued.

What do addition drawings usually include?

Addition applications typically include a site plan, floor plans, elevations, building sections and structural information. Many municipalities also ask for a current survey and energy efficiency information. Your municipality publishes its own list of required documents.

Who can prepare permit drawings in Ontario?

Under Ontario's Building Code, permit drawings for most projects must be prepared by a designer who is qualified and registered with the province, or by a licensed architect or professional engineer. Owners can generally prepare drawings for their own house. Qualified designers are identified by a Building Code Identification Number (BCIN), which can be checked in the province's public registry.

What happens during the municipal review?

Once the application is complete, the municipality reviews it and may issue comments asking for clarification or changes. Responding clearly and completely to those comments is one of the most effective ways to keep an application moving.

Key terms

Minor variance
Permission from a municipality's Committee of Adjustment for a small departure from a zoning by-law requirement, such as a reduced setback.
BCIN
Building Code Identification Number. The province issues it to designers who are qualified and registered under the Building Code, and it appears on the drawings they prepare.
Complete application
A permit application that includes all the documents and information the Building Code and your municipality require. Review time frames start once an application is complete.

Questions

Do I need an engineer for my addition?

Many additions need structural input, and some elements may need to be designed by a professional engineer. Whether yours does depends on the design and what your municipality requires.

Sources and review

This guide is general information, not legal or code advice. Requirements change, and your municipality decides what applies to your property.
  1. Citizen's guide to land use planning: Building permits(opens in a new tab)

    Government of Ontario · Link not yet verified by PermitGuys

  2. Building Code Act, 1992, S.O. 1992, c. 23(opens in a new tab)

    Government of Ontario (e-Laws) · Link not yet verified by PermitGuys

Reviewed by

PLACEHOLDER: name and verified credentials of the person who reviews this guide

Start a conversation

Have a question about your own project?

Share what you are planning and where. We will review the details and explain how we can help with drawings and the permit process.

What happens next

  1. 01You tell us what you are planning and where.
  2. 02We review the details and reply to explain how we can help.
  3. 03You decide whether to go ahead.