Short answer
Finishing a basement with new walls, a bathroom or a bedroom commonly needs a building permit, while purely cosmetic updates may not. We help you find out which applies, design the space and prepare the permit drawings when one is needed.

Quick permit overview
- Usually in the application
- Existing and proposed basement floor plans; Bedroom windows, exits and smoke and carbon monoxide alarms; Plumbing information for a new bathroom or laundry; Insulation and moisture protection for the foundation walls; Structural details where posts, beams or walls are moved.
- Permits issued by
- The municipality where the property is. Its building department reviews the application, decides whether a permit is issued and inspects the work.Source: Ontario: regulatory roles for construction and renovations(opens in a new tab)
- Who can design the drawings
- A designer registered with a BCIN (Building Code Identification Number), an architect or a professional engineer. Larger buildings, over three storeys or over 600 m² in gross area, generally need an architect.Source: Ontario: become a registered building practitioner (BCIN, QuARTS)(opens in a new tab)
- Municipal review time
- Ontario's Building Code sets time frames for a decision on a complete application. The City of Toronto, for example, lists 10 business days for houses, 15 for small buildings, 20 for large buildings and 30 for complex buildings. Incomplete applications or revisions can extend this.Source: City of Toronto: Building permit review streams(opens in a new tab)
- What PermitGuys does
- Designs the project and prepares the architectural and engineering drawings (Small Buildings BCIN, licensed P.Eng. engineers, architectural stamps in house), then submits the permit application as the owner's agent. The municipality decides whether a permit is issued.
- Where we work
- Toronto, Mississauga, Oakville, Brampton, Markham, Newmarket, Aurora, Oshawa, Burlington, Hamilton.
What does this service include?
A finished basement adds living space for the people who already live in the house: a family room, an office, a guest bedroom or a bathroom. It is not a separate unit. A basement with its own kitchen and entrance for another household is a second unit, which is reviewed differently (see Legal basement apartments).
We document the existing basement, design the new layout and work out what the design has to address, such as ceiling heights, bedroom windows, plumbing for a new bathroom, insulation and any posts or beams the layout affects.
Who is this service for?
- Homeowners turning an unfinished basement into living space.
- Families adding a bedroom, bathroom or office downstairs.
- Owners who want the basement designed so it could become a second unit later.
What does a permit application usually need?
- Existing and proposed basement floor plans.
- Bedroom windows, exits and smoke and carbon monoxide alarms.
- Plumbing information for a new bathroom or laundry.
- Insulation and moisture protection for the foundation walls.
- Structural details where posts, beams or walls are moved.
Requirements depend on your municipality, your property and the specific scope of work. Your local building department makes the final determination, so we confirm requirements for each project rather than assume them.
Who does what, step by step?
- 01
Tell us about the project
You share what you want to build, the property address and any existing drawings, surveys or photos of the basement.
Handled by: You
- 02
Assess the requirements
We review the scope against the applicable zoning and Building Code considerations we can identify, and flag anything that may need input from other consultants or the municipality.
Handled by: PermitGuys
- 03
Design, engineering and drawings
We design the project, work out the engineering it needs, prepare the permit drawings and assemble the documentation, coordinating with any other specialists the project requires.
Handled by: PermitGuys
- 04
Municipal review
The municipality reviews the application, may ask questions or request revisions, and decides whether to issue the permit.
Handled by: Municipality
- 05
Respond to review comments
Where the municipality comments on the drawings, we help you understand the comments and revise the drawings we prepared.
Handled by: PermitGuys
What affects cost and timing?
Cost factors
- The size and complexity of the project and how many drawings it needs.
- Whether existing-condition measurements, a survey or as-built drawings are needed first.
- Whether the project needs input from structural, mechanical or other consultants.
- Whether a zoning variance or other planning approval is needed before a permit.
- The number of revision rounds the municipal review requires.
Timeline factors
- How quickly site information, surveys and decisions are available.
- Whether a planning approval, such as a minor variance, is needed first.
- Whether the application is complete when submitted.
- The municipality's current review workload and any requests for revisions.
Examples of our work
Written-up projects appear here as clients approve them. Renderings from our client projects are on the projects page.
Common questions
Do I need a permit to finish my basement?
Finishing a basement often involves work that needs a permit, such as new walls and rooms, a bathroom, changes to the structure or to heating and ventilation. Replacing finishes alone may not. Your building department confirms what your project needs.
What is the difference between a finished basement and a legal basement apartment?
A finished basement is more living space for your own household. A basement apartment is a separate unit for another household, with its own kitchen and entrance, and it has to meet further Building Code, Fire Code and zoning requirements. If you might rent the space later, tell us at the start so the design does not close that door.
How much will this cost?
Fees depend on the scope of your project, so we quote after we understand what you want to build. Municipal permit fees are separate and are set by your municipality.
Start a conversation
Discuss your finished basements project.
Share what you are planning and where. We will review the details and explain how we can help with drawings and the permit process.
What happens next
- 01You tell us what you are planning and where.
- 02We review the details and reply to explain how we can help.
- 03You decide whether to go ahead.