Below-Grade Entrance Permits

Short answer

A below-grade entrance cuts a new opening in the foundation wall and builds a stairwell down to it, so it generally needs a building permit, and zoning rules can limit where it may go. We design the entrance, work out its structure and prepare the permit drawings.

The side of a pale rendered two-storey house at dusk, a concrete stairwell with a black rail leading down to a lit, glazed basement door.
Rendered study for illustration, not a client project.

Quick permit overview

Usually in the application
A site plan showing the entrance, the house, property lines and setbacks; Plans and a section through the stairwell and the new door; Structural details for the opening in the foundation wall and the retaining walls; Guard, handrail and stair details; Drainage at the bottom of the stairwell.
Permits issued by
The municipality where the property is. Its building department reviews the application, decides whether a permit is issued and inspects the work.Source: Ontario: regulatory roles for construction and renovations(opens in a new tab)
Who can design the drawings
A designer registered with a BCIN (Building Code Identification Number), an architect or a professional engineer. Larger buildings, over three storeys or over 600 m² in gross area, generally need an architect.Source: Ontario: become a registered building practitioner (BCIN, QuARTS)(opens in a new tab)
Municipal review time
Ontario's Building Code sets time frames for a decision on a complete application. The City of Toronto, for example, lists 10 business days for houses, 15 for small buildings, 20 for large buildings and 30 for complex buildings. Incomplete applications or revisions can extend this.Source: City of Toronto: Building permit review streams(opens in a new tab)
What PermitGuys does
Designs the project and prepares the architectural and engineering drawings (Small Buildings BCIN, licensed P.Eng. engineers, architectural stamps in house), then submits the permit application as the owner's agent. The municipality decides whether a permit is issued.
Where we work
Toronto, Mississauga, Oakville, Brampton, Markham, Newmarket, Aurora, Oshawa, Burlington, Hamilton.

What does this service include?

A separate basement entrance is often the first step toward a basement apartment, and it is also useful on its own, for access to a basement workshop, office or family space. Because it changes the foundation and the yard, it is reviewed for both its structure and its location on the lot.

We check the side and rear yards against the zoning considerations we can identify, design the stair, retaining walls and new opening, and coordinate any structural input the foundation needs.

Who is this service for?

  • Homeowners adding a separate side or rear entrance to the basement.
  • Owners preparing a basement for a future second unit.
  • Owners who want to replace or enlarge an existing basement stairwell.

What does a permit application usually need?

Below-grade entrance applications commonly include items such as:
  • A site plan showing the entrance, the house, property lines and setbacks.
  • Plans and a section through the stairwell and the new door.
  • Structural details for the opening in the foundation wall and the retaining walls.
  • Guard, handrail and stair details.
  • Drainage at the bottom of the stairwell.

Requirements depend on your municipality, your property and the specific scope of work. Your local building department makes the final determination, so we confirm requirements for each project rather than assume them.

Who does what, step by step?

Each step shows who carries it. We prepare drawings and documentation; the municipality reviews the application and decides on the permit.
  1. 01

    Tell us about the project

    You share what you want to build, the property address and any existing drawings, surveys or photos of the house and yard.

    Handled by: You

  2. 02

    Assess the requirements

    We review the scope against the applicable zoning and Building Code considerations we can identify, and flag anything that may need input from other consultants or the municipality.

    Handled by: PermitGuys

  3. 03

    Design, engineering and drawings

    We design the project, work out the engineering it needs, prepare the permit drawings and assemble the documentation, coordinating with any other specialists the project requires.

    Handled by: PermitGuys

  4. 04

    Municipal review

    The municipality reviews the application, may ask questions or request revisions, and decides whether to issue the permit.

    Handled by: Municipality

  5. 05

    Respond to review comments

    Where the municipality comments on the drawings, we help you understand the comments and revise the drawings we prepared.

    Handled by: PermitGuys

What affects cost and timing?

We do not publish set prices or timelines because both depend on the project. These are the factors that shape them.

Cost factors

  • The size and complexity of the project and how many drawings it needs.
  • Whether existing-condition measurements, a survey or as-built drawings are needed first.
  • Whether the project needs input from structural, mechanical or other consultants.
  • Whether a zoning variance or other planning approval is needed before a permit.
  • The number of revision rounds the municipal review requires.

Timeline factors

  • How quickly site information, surveys and decisions are available.
  • Whether a planning approval, such as a minor variance, is needed first.
  • Whether the application is complete when submitted.
  • The municipality's current review workload and any requests for revisions.

Examples of our work

Written-up projects appear here as clients approve them. Renderings from our client projects are on the projects page.

PLACEHOLDER: approved below-grade entrances case studies. This block lists real projects automatically once they are added to src/content/projects.ts with approved: true.

Common questions

Do I need a permit for a separate basement entrance?

Cutting a new opening in a foundation wall and building a stairwell to it is structural work, and it commonly needs a building permit in GTA municipalities. Your local building department confirms what your project needs.

Can a below-grade entrance go in a side yard?

It depends on your municipality's zoning by-law and the width of the side yard. Some by-laws limit entrances in side yards or set minimum clearances. If the location does not meet the by-law, a minor variance may be needed first. We flag this when we assess your property.

How much will this cost?

Fees depend on the scope of your project, so we quote after we understand what you want to build. Municipal permit fees are separate and are set by your municipality.

Start a conversation

Discuss your below-grade entrances project.

Share what you are planning and where. We will review the details and explain how we can help with drawings and the permit process.

What happens next

  1. 01You tell us what you are planning and where.
  2. 02We review the details and reply to explain how we can help.
  3. 03You decide whether to go ahead.