City of Toronto
Building permits and permit drawings in Toronto, ON
Short answer
The City of Toronto (Toronto Building) issues building permits in Toronto. PermitGuys designs projects in Toronto, from additions, basement apartments and decks to custom homes and commercial interiors, prepares the architectural and engineering drawings, and submits the permit application as the owner's agent. The municipality decides whether a permit is issued.
Quick permit overview
- Permits issued by
- The City of Toronto (Toronto Building). It reviews applications, decides whether a permit is issued and inspects the work.Source: Toronto: when do I need a building permit?(opens in a new tab)
- How to apply
- Online through the City's building permit services; the application guides list the drawings each project type needs.
- Building department contact
- 311
- Who can design the drawings
- A designer registered with a BCIN (Building Code Identification Number), an architect or a professional engineer. Larger buildings, over three storeys or over 600 m² in gross area, generally need an architect.Source: Ontario: become a registered building practitioner (BCIN, QuARTS)(opens in a new tab)
- Published review time
- For a complete application, the City lists 10 business days for houses, 15 for small buildings, 20 for large buildings and 30 for complex buildings. Incomplete applications or revisions can extend this.Source: City of Toronto: Building permit review streams(opens in a new tab)
- What PermitGuys does
- Designs the project and prepares the architectural and engineering drawings (Small Buildings BCIN, licensed P.Eng. engineers, architectural stamps in house), then submits the permit application as the owner's agent. The municipality decides whether a permit is issued.
Building permits in Toronto
What does Toronto say about when a permit is needed?
- Toronto Building issues permits. Needs a permit (not a complete list): new buildings and additions, including second or third storeys, attached garages, sunrooms, porches and decks; adding or removing walls; new or enlarged windows and doors; enclosing a deck, porch or patio; sheds of 15 m² or more; accessory structures over 10 m² (any size if attached to a building or with plumbing); decks more than 60 cm (24 in) above ground; retaining walls over 1 m next to public property or areas the public can access; demolition; chimneys, fireplaces and wood stoves; heating and plumbing work; and any change of use, even with no construction.
- Finishing a basement needs a permit if it involves structural or material alterations, heating or plumbing changes, excavation or new foundations, underpinning, a new basement entrance or a second suite. Finishing with none of these does not.
- No permit (the zoning by-law still applies): uncovered decks at or below 60 cm that are not part of a required exit; insulation; same-size window or door replacement in a house; furnace or boiler replacement in a house; reroofing with no structural work; basement waterproofing repairs; cabinetry; sheds of 15 m² or less, one storey, detached, storage only and without plumbing.
- Toronto has building permit application guides for secondary suites, garden suites, laneway suites and multiplex conversions (an existing house converted to a duplex, triplex, fourplex, fiveplex or sixplex), plus pre-approved garden and laneway suite plans and a development charges deferral program for these suites.
- Garden suite fire access, per the City's guide: access from the street the house faces, a maximum 45-metre travel distance from the public street to the suite's entrance, and a path at least 1.0 m wide with 2.1 m vertical clearance.
- Drawings by a qualified designer must show the designer's name, registration number, qualification ID and signature; the Schedule 1 designer form is required for all designers except engineers and architects. Before applying, Toronto offers a Preliminary Zoning Review and a pre-check tool. Minor variances go to Toronto's Committee of Adjustment.
Summarised from the City of Toronto (Toronto Building)'s own pages, read on October 24, 2026. These are not complete lists and rules change: the building department decides for each property, so check the official pages below.
Common questions
Who issues building permits in Toronto?
The City of Toronto (Toronto Building) issues building permits for properties in Toronto.
Municipalities issue building permits, set permit fees, review applications and inspect construction. Each municipal council appoints a chief building official and inspectors. The details of what needs a permit and what to submit can differ from one municipality to the next.
Can PermitGuys prepare permit drawings and apply for a permit in Toronto?
Yes. Toronto is one of the municipalities we work in. We design the project, prepare the architectural and engineering drawings and submit the building permit application as the owner's agent.
The City of Toronto (Toronto Building) reviews the application and decides whether a permit is issued, so we never promise approvals or timelines.
How do I apply for a building permit in Toronto?
Online through the City's building permit services; the application guides list the drawings each project type needs.
Building department contact: 311.
Do I need a BCIN designer, an architect or an engineer for a permit in Toronto?
Designers who are not architects or engineers must be qualified and registered with the Ministry of Municipal Affairs and Housing: they hold a Building Code Identification Number (BCIN), pass Building Code exams in categories such as House and Small Buildings, and are listed in the public QuARTS registry. Most municipal permit applications include a Schedule 1 designer information form for them.
Under the Architects Act, an architect is not required for buildings of not more than three storeys and not more than 600 m² in gross area, for a house or two attached dwelling units built on grade up to three storeys, and for certain interior alterations within a dwelling unit. Larger projects need an architect. The OAA directory lists licensed architects.
Official municipal links
- Toronto: when do I need a building permit?(opens in a new tab)
- Toronto: before you apply(opens in a new tab)
- Toronto: building more units on your property(opens in a new tab)
- Toronto: multiplex conversion guide(opens in a new tab)
- Toronto: new garden suite guide(opens in a new tab)
- Toronto: Committee of Adjustment(opens in a new tab)
Start a conversation
Planning a project in Toronto?
Share what you are planning and where. We will review the details and explain how we can help with drawings and the permit process.
What happens next
- 01You tell us what you are planning and where.
- 02We review the details and reply to explain how we can help.
- 03You decide whether to go ahead.