Halton Region
Building permits and permit drawings in Burlington, ON
Short answer
The City of Burlington issues building permits in Burlington. PermitGuys designs projects in Burlington, from additions, basement apartments and decks to custom homes and commercial interiors, prepares the architectural and engineering drawings, and submits the permit application as the owner's agent. The municipality decides whether a permit is issued.
Quick permit overview
- Permits issued by
- The City of Burlington. It reviews applications, decides whether a permit is issued and inspects the work.Source: Burlington: do I need a building permit?(opens in a new tab)
- Building department contact
- Building permits 905-335-7731; Service Burlington 905-335-7777
- Who can design the drawings
- A designer registered with a BCIN (Building Code Identification Number), an architect or a professional engineer. Larger buildings, over three storeys or over 600 m² in gross area, generally need an architect.Source: Ontario: become a registered building practitioner (BCIN, QuARTS)(opens in a new tab)
- What PermitGuys does
- Designs the project and prepares the architectural and engineering drawings (Small Buildings BCIN, licensed P.Eng. engineers, architectural stamps in house), then submits the permit application as the owner's agent. The municipality decides whether a permit is issued.
Building permits in Burlington
What does Burlington say about when a permit is needed?
- No permit for a detached accessory deck for a house that is under 10 m², under 60 cm high and not covered or roofed. Decks outside these limits may need a permit.
- No permit for a shed or accessory structure for a house that is one storey or less, under 15 m² and without plumbing (or any structure under 10 m² without plumbing).
- No permit for same-opening window and door replacement, uncovered on-grade patios, retaining walls of 1 m or less, and like-for-like heating and cooling replacement. Electrical permits come from the Electrical Safety Authority.
- Burlington has an ARU look-up tool and an ARU incentive program on its website.
Summarised from the City of Burlington's own pages, read on October 24, 2026. These are not complete lists and rules change: the building department decides for each property, so check the official pages below.
Common questions
Who issues building permits in Burlington?
The City of Burlington issues building permits for properties in Burlington.
Municipalities issue building permits, set permit fees, review applications and inspect construction. Each municipal council appoints a chief building official and inspectors. The details of what needs a permit and what to submit can differ from one municipality to the next.
Can PermitGuys prepare permit drawings and apply for a permit in Burlington?
Yes. Burlington is one of the municipalities we work in. We design the project, prepare the architectural and engineering drawings and submit the building permit application as the owner's agent.
The City of Burlington reviews the application and decides whether a permit is issued, so we never promise approvals or timelines.
Do I need a BCIN designer, an architect or an engineer for a permit in Burlington?
Designers who are not architects or engineers must be qualified and registered with the Ministry of Municipal Affairs and Housing: they hold a Building Code Identification Number (BCIN), pass Building Code exams in categories such as House and Small Buildings, and are listed in the public QuARTS registry. Most municipal permit applications include a Schedule 1 designer information form for them.
Under the Architects Act, an architect is not required for buildings of not more than three storeys and not more than 600 m² in gross area, for a house or two attached dwelling units built on grade up to three storeys, and for certain interior alterations within a dwelling unit. Larger projects need an architect. The OAA directory lists licensed architects.
Official municipal links
Start a conversation
Planning a project in Burlington?
Share what you are planning and where. We will review the details and explain how we can help with drawings and the permit process.
What happens next
- 01You tell us what you are planning and where.
- 02We review the details and reply to explain how we can help.
- 03You decide whether to go ahead.