The Town of Aurora issues building permits in Aurora. PermitGuys designs projects in Aurora, from additions, basement apartments and decks to custom homes and commercial interiors, prepares the architectural and engineering drawings, and submits the permit application as the owner's agent. The municipality decides whether a permit is issued.

Quick permit overview

Permits issued by
The Town of Aurora. It reviews applications, decides whether a permit is issued and inspects the work.Source: Aurora: applications, permits and inspections(opens in a new tab)
How to apply
Online portal: https://cvportal.aurora.ca/Portal/ (or by email to building@aurora.ca)
Building department contact
building@aurora.ca; (365) 500-2081
Who can design the drawings
A designer registered with a BCIN (Building Code Identification Number), an architect or a professional engineer. Larger buildings, over three storeys or over 600 m² in gross area, generally need an architect.Source: Ontario: become a registered building practitioner (BCIN, QuARTS)(opens in a new tab)
What PermitGuys does
Designs the project and prepares the architectural and engineering drawings (Small Buildings BCIN, licensed P.Eng. engineers, architectural stamps in house), then submits the permit application as the owner's agent. The municipality decides whether a permit is issued.

Building permits in Aurora

What does Aurora say about when a permit is needed?

  • No permit (zoning still applies): unroofed decks no more than 0.6 m (2 ft) above grade; detached buildings of 15 m² or less without plumbing; finishing a basement with no structural alteration and no added sleeping accommodation; same-opening window and door replacement. Pool enclosure fences need a permit.
  • Aurora has a registration application for a second or third dwelling unit.

Summarised from the Town of Aurora's own pages, read on October 24, 2026. These are not complete lists and rules change: the building department decides for each property, so check the official pages below.

Common questions

Who issues building permits in Aurora?

The Town of Aurora issues building permits for properties in Aurora.

Municipalities issue building permits, set permit fees, review applications and inspect construction. Each municipal council appoints a chief building official and inspectors. The details of what needs a permit and what to submit can differ from one municipality to the next.

Can PermitGuys prepare permit drawings and apply for a permit in Aurora?

Yes. Aurora is one of the municipalities we work in. We design the project, prepare the architectural and engineering drawings and submit the building permit application as the owner's agent.

The Town of Aurora reviews the application and decides whether a permit is issued, so we never promise approvals or timelines.

How do I apply for a building permit in Aurora?

Online portal: https://cvportal.aurora.ca/Portal/ (or by email to building@aurora.ca)

Building department contact: building@aurora.ca; (365) 500-2081.

Do I need a BCIN designer, an architect or an engineer for a permit in Aurora?

Designers who are not architects or engineers must be qualified and registered with the Ministry of Municipal Affairs and Housing: they hold a Building Code Identification Number (BCIN), pass Building Code exams in categories such as House and Small Buildings, and are listed in the public QuARTS registry. Most municipal permit applications include a Schedule 1 designer information form for them.

Under the Architects Act, an architect is not required for buildings of not more than three storeys and not more than 600 m² in gross area, for a house or two attached dwelling units built on grade up to three storeys, and for certain interior alterations within a dwelling unit. Larger projects need an architect. The OAA directory lists licensed architects.

Official municipal links

Start a conversation

Planning a project in Aurora?

Share what you are planning and where. We will review the details and explain how we can help with drawings and the permit process.

What happens next

  1. 01You tell us what you are planning and where.
  2. 02We review the details and reply to explain how we can help.
  3. 03You decide whether to go ahead.